Properly setting and testing a wellhead is a mission-critical operation that ensures pressure containment and long-term well integrity. This guide details the essential technical procedures required to install the housing, seat the hangers, and perform reliable pressure testing.
Step 1: Verify Casing Landing Surface
Inspect the casing head and hanger landing shoulders for any debris or metal shavings. Clean these surfaces thoroughly because even minor particles can prevent a metal-to-metal seal from seating correctly.
Step 2: Set the Casing Hanger
Lower the casing hanger into the wellhead housing while maintaining strict control over the string weight. Ensure the hanger lands squarely on the shoulder to avoid cocking, which leads to immediate seal failure.
Step 3: Install Packoff or Seal Assembly
Carefully land the packoff assembly above the casing hanger to isolate the annulus. Verify that the energizing bolts or hydraulic ports are clean before attempting to set the seal element.
Step 4: Energize the Annulus Seal
Apply the manufacturer-specified torque to the lockdown screws or activate the hydraulic setting tool. An improperly energized seal will result in a leak path that fails the subsequent pressure test.
Step 5: Prepare Wellhead for Pressure Test
Isolate all valves leading to the flowlines and confirm that the pressure test unit is connected to the appropriate test port. Verify that all auxiliary components like gate valves are in the closed position to avoid over-pressuring downstream equipment.
Step 6: Execute Primary Wellhead Pressure Test
Slowly introduce pressure to the cavity between the primary and secondary seals according to the required well program. If the pressure bleeds off, re-inspect your connections and seal energization before attempting to re-test.
Step 7: Monitor Pressure Stabilization
Once the target test pressure is reached, close the pump and monitor for any deviation on the calibrated gauge. Any observed pressure drop indicates a faulty seal assembly or a compromised seal pocket on the wellhead flange.
Step 8: Perform Final Visual Inspection
Inspect the entire wellhead assembly for external leaks during the hold period. A successful test is only valid if the pressure remains stable and the assembly shows no signs of weepage or mechanical bypass.
Achieving a successful pressure test confirms that the wellhead assembly will effectively contain reservoir fluids. Always remove the test pump and reinstall port plugs with fresh thread compound before returning the equipment to service.
Need help finding vendors for your project?
Explore Trunkline’s Top 10 vendor rankings to find companies with the experience and capabilities to get the job done.