
Addressing a wellhead leak requires a methodical approach to maintain well integrity and prevent environmental hazards. This guide covers the essential field procedures for identifying the leak source, performing repairs, and completing a successful pressure test.
Step 1: Perform Initial Leak Inspection
Conduct a visual inspection of the wellhead assembly to confirm the leak location. Check all flange faces, ring gaskets, and threaded connections for visible product accumulation.
Step 2: Isolate the Wellhead Pressure
Before starting any repair work, isolate the wellhead from pressure sources by closing the master valves. Bleed off any trapped pressure safely through the bleed-off valve into a containment vessel.
Step 3: Inspect Wellhead Flange Connections
Examine the flange bolts for signs of uneven tension or corrosion. If the leak originates at a flange interface, ensure the bolts are properly cleaned and that the ring gasket seating surface remains clear of debris.
Step 4: Tighten Flange Bolting Sequentially
Use a star pattern to tighten flange bolts incrementally to ensure even compression of the gasket. Uneven tightening often causes the leak to migrate to the opposite side of the flange.
Step 5: Replace Damaged Ring Gaskets
If tightening fails to seal the connection, break the flange to inspect the ring gasket for deep pitting or deformation. Replace the old gasket with a new one of the exact same material and profile specifications.
Step 6: Test Wellhead Seal Integrity
Once components are reassembled, apply a low-pressure test to the assembly to verify the seal. Gradually bring the pressure up to the required levels while monitoring the connection for any signs of seepage.
Step 7: Verify Pressure Stabilization
Hold the test pressure for the prescribed duration to observe any pressure drop on the gauge. A steady reading indicates that the repair has successfully resolved the leak.
Step 8: Document Final Leak Repair
Record the findings, the nature of the repair, and the final pressure test results in the daily operations log. Proper documentation ensures that all safety protocols were met for future reference.
Following these steps minimizes downtime while ensuring the wellhead meets safety compliance standards. Always confirm that all bleed valves are closed and locked before returning the equipment to active service.
Need help finding vendors for your project?
Explore Trunkline’s Top 10 vendor rankings to find companies with the experience and capabilities to get the job done.

