
Optimizing artificial lift performance is critical for maintaining consistent production levels in gas wells. This guide outlines the standard procedures for identifying and addressing mechanical or control failures within your plunger lift system.
Step 1: Review Wellhead Automation Controller Data
Analyze the Programmable Logic Controller or remote terminal unit logs to identify abnormal cycle times or pressure anomalies. Look for inconsistent arrival times or missed cycles that indicate a systemic failure. A failure to record pressure differentials usually points toward sensor calibration errors or electrical communication loss.
Step 2: Verify Surface Equipment Pressure Integrity
Check all downstream valves and the flow line for signs of plugging or freezing. Use a gauge to compare current line pressure against historical data points for the well. A sudden spike in backpressure often suggests a downstream blockage rather than an issue with the plunger itself.
Step 3: Inspect Plunger Arrival Sensors
Examine the magnetic or acoustic sensor mounted on the lubricator for proper alignment and wiring integrity. Confirm that the sensor successfully detects the plunger arrival during manual testing. If the signal is intermittent, the sensor is likely failing or improperly gapped.
Step 4: Isolate the Plunger Lubricator Assembly
Close the wing valve and isolate the lubricator to safely inspect internal components. Carefully bleed off trapped pressure before attempting to open the housing. Check for debris buildup or spring damage inside the spring-loaded bumper assembly.
Step 5: Perform a Plunger Fall Test
Drop the plunger and monitor the fall velocity to ensure it is not hanging up in the tubing string. A slow or erratic fall speed indicates paraffin buildup, scale, or damaged tubing joints. Failure to reach the bottom signifies a severe obstruction requiring wireline intervention.
Step 6: Troubleshoot Plunger Seal Wear
Retrieve the plunger and physically inspect the seal pads or brushes for excessive wear and tear. Measure the diameter to ensure it still conforms to the tubing drift requirements. If the pads are flattened or missing, the plunger will bypass gas and fail to lift the fluid column.
Step 7: Test Master Valve and Controller Operation
Cycle the master valve manually to ensure it holds pressure and responds to the automated signals. Verify that the controller triggers the valve movement at the designated pressure setpoints. Improper valve timing prevents the system from establishing the lift pressure necessary to move the fluid load.
Following these steps ensures your artificial lift equipment returns to reliable operation. Always confirm the wellhead pressure has stabilized before transitioning the system back to fully automated control.
Need help finding vendors for your project?
Explore Trunkline’s Top 10 vendor rankings to find companies with the experience and capabilities to get the job done.

